1880 Knox Save not raze II Project House



One week with the Save not Raze II Project house and things are moving nicely. The front picket fence is up. The lower half of the front facade is now stripped and has a coat of paint. The front yard has been mulched as well.

On the inside the third floor has had the old drywall removed and much of the old paneling in the house has been removed as well.

The Save not Raze II project house will be resold with protective covenants once the exterior stabilization is completed. If you or someone you know would like to be part of the revitalization of the Knox Hill Neighborhood please contact me