With a blizzard coming work will be slowed down on the project so I thought I'd update everyone on some really good progress.




All the stucco is gone from South and east elevations so siding and window work can happen . By our counts about 18 cu yards of material removed. In short, TONS of weight removed.The house is now Tvecked and interior sealing with expandable foam is ongoing


We also installed the gable window which is the same size as the original, of course we had some re-framing to due  because of old rot. Great view out the front.

Interior work is coming along nicely and all the old deteriorated plaster and drywall is gone. And thanks to some new lighting (part of the new security system) the house is lit up quite nicely.

2 comments:

Brian said...

Hi,

I have a quick question about your blog, do you think you could e-mail me?

Brian

Adalee semon said...

If you are looking for a gift simply unique, look for biblical reproductions. Christmas is certainly the most appropriate time to live your faith with the most amazing gift.
Dead Sea Scrolls Online